|
|
Hydraulic
Sub-Containment System
Challenge:
A leading manufacturer of telescopic loading equipment requested
redesign ideas to simplify the hydraulic tank and circuit
to alleviate existing filtration problems, lengthly assembly
time and vendor complexity. |
|
|
Financial
Services Equipment
Challenge:
A leading OEM of cash automation financial equipment serving
financial institutions and retail banking needed to reduce
its direct material expenses and on-hand inventory. |
|
|
Medical
Equipment
Challenge:
A leading
manufacturer of mammography film reading systems incurred
significant expense in managing high inventory levels, MRP
transactions and the storage of 36 individual piece parts
for two different systems. Increased manufacturing flexibility
was required to support demand. |
|
|
OEM
of Aerial Work Platforms
Challenge:
A leading
producer of mobile aerial work platforms, including boom
and scissor lifts, needed to reduce its direct material
costs of hydraulic reservoirs while improving delivery flexibility
and lead-time. |
|
|
|
|
OEM
of Construction Equipment
Challenge:
A leading
manufacturer of construction and mining equipment needed
to reduce annual costs to remain competitive in its markets. |
|
|
OEM
of Mining Equipment
Challenge:
A manufacturer
of construction and mining equipment needed to reduce its
non value-added costs by decreasing its replenishment time.
Helgesen identified that the current functional designs
were too cost-prohibitive to meet project objectives. |
|
|
Telescopic
Material Handling OEM
Challenge:
A large
OEM of telescopic material handling equipment had experienced
severe quality defects on its combination fuel/hydraulic
reservoir causing assembly line downtime and field warranty
failures. |
|
|